Till to date, Horse Power has 5 projects to be completed.
a. Energy Saving - To reduce no. of drive motor at Dipping Line 5
Problems : The distance between 2 drive motors too long.
Status :Identifying which drive motors to be remove already done but it may cannot coupe up with the production load.
b. Reduce Breakdown - Improving the backwash device.
Status : Backwash already been modified. To get suitable date and time from production to install the device
c. Process Improvement : To install carton lifter ( Pincer Machine ) at Selection.
Status : Installation done. Waiting formal handover to production.
d. Process Improvement : Direct Kiln to Selection
Status ; Still in quotation stage.(Part Order)
e. Process Improvement : To install self cleaning device for dust sifter.
Status : Project implementation.